The Olive Mill Roundabout will improve traffic flow at the intersection at Olive Mill Road, Coast Village Road, North Jameson Lane, the northbound Highway 101 off-ramp at Olive Mill Road, and the southbound Highway 101 on-ramp at Olive Mill Road. The new roundabout is designed for 20 mph. Drivers will see signs for each roadway name at each leg of the roundabout. The center of the roundabout will be planted with olive trees and feature a sandstone retaining wall. Lighting will be improved around the roundabout.

 

Pedestrians will have access with crosswalks around the mountain side of the roundabout. Bicyclists can either take the lane through the roundabout or walk bikes using pedestrian sidewalks and crosswalks on the mountain side.

 

Construction is scheduled from December 2022 through spring 2023. This project is being delivered early due to regional funding programmed by SBCAG.

Olive Mill Roundabout Project Header
star.png
Headers_Summerland.png
Headers_Padaro.png
Headers_Carp.png
Gray Headers_Mont blue.png
Gray Headers_SB.png
Roadway Improvements
header_roadway.png
Fact Sheet Olive Mill Roundabout wix top.png
OM Stages Layout.png
ACCESS THROUGH CONSTRUCTION_construction near sand point road.png

Drivers will have daytime access through the intersection during construction. To reduce congestion and provide enough space to build the roundabout, the northbound Highway 101 off-ramp at Olive Mill Road will remain closed throughout construction. The southbound Highway 101 on-ramp at Olive Mill Road will be closed for approximately 1.5 months during the first stage of construction.

 

Pedestrians and bicyclists are encouraged to use a temporary detour on Santa Isabel Lane, Santa Clara Way, Santo Tomas Lane, and Olive Mill Road during stages 1A, 1B, and 2A of construction. Bicyclists may also share the lane during this time.

 

During stages 2B and 3, access through the roundabout will remain open for pedestrians, bicyclists, and drivers.

 

Throughout construction, please expect flaggers directing traffic and night work as needed.

Project Timeline
header_timeline.png

The timeline is a reference tool to show planned improvements and key closures.

 

The timing may change to accommodate modifications from the contractor, weather delays, and to improve construction.

Olive Mill Only Timeline.png
Headers_Summerland.png
Headers_Padaro.png
Headers_Carp.png
HWY Road Graphic Headers_SCL Bikeway Gray.png
SYR header.png
Gray Headers_Mont.png
carp–sb–logo.png

Highway 101: Carpinteria to Santa Barbara is a project undertaken by Caltrans and SBCAG in cooperation with local agencies to add a new carpool lane in each direction between Carpinteria and Santa Barbara. The project will improve bridges, interchanges, on- and off-ramps, and add sound walls.